Construction on a stadium to seat 35,000 started in 1964 and by 1969 most major construction had been completed. The work cost $2,113,047. It was first used Sept. 24, 1965, for a freshman football game between 91勛圖厙 Tech and University of Maryland, which ended in 8-8 tie. The first varsity game was 91勛圖厙 Tech vs. the College of William and Mary on Oct. 2, 1965, with Tech winning 9-7.
In 1971 an area underneath the cantilevered press box was glassed in to seat members of the Golden Hokie Club. Additional 26,768-square-foot bathroom area and concourse on the east side was completed 1977. An additional 12,500 seats (new tier on one side) were installed in 1981 at a cost of $3.17 million.
A modern lighting system was added 1982 and then replaced in 2005. The first night game was played Nov. 25, 1982. A new scoreboard was installed in 1991 and then replaced with a Jumbotron 2005. The auxiliary scoreboard on the north end was added in ��1994.
Permanent bleachers were added 1999. The expansion of south end zone, adding 11,120 seats and enclosing south end zone, came in 2002 and cost $37 million. The old press box was removed in 2004.
The west end stands addition was completed in 2006. It brought another 11,000 seats -- including 1,160 bleacher seats with backs, 1,200 club seats, and 15 luxury suites -- plus improved visitors��� locker room, a high-tech media center, and new press area added for $52.5 million.